The Department of Transportation has announced a number of lane closures throughout Hawaiʻi Island during the week of February 6, 2023. Lane closure schedules may change at any time without further notice. All projects are weather permitting.
VOLCANO ROAD/MAMALAHOA HIGHWAY (ROUTE 11)
NORTH OF PAHALA
Single lane closure on Mamaloha Highway (Route 11) possible in either direction between mile markers 44 and 46, on Monday, Feb. 6, through Friday, Feb. 10, from 8:30 a.m. to 4:30 p.m. for vegetation cutting.
KUAKINI HIGHWAY (ROUTE 11)
HONALO
Single lane closure on Kuakini Highway (Route 11) possible in either direction in the vicinity of mile marker 114, near West Honalo Road, on Monday, Feb. 6, through Friday, Feb. 10, from 8:30 a.m. to 3 p.m., for Kuakini Drainage Improvements.
HAWAII BELT ROAD (ROUTE 19)
PEPEEKEO TO HAKALAU
Single lane closure on Hawaii Belt Road (Route 19) possible in either direction between mile markers 10 and 14, Kulaimano Road to vicinity of Kolekole Beach Park, on Monday, Feb. 6, through Friday, Feb. 10, from 8:30 a.m. to 4:30 p.m., for vegetation cutting.
HAKALAU TO NINOLE
Single lane closure on Hawaii Belt Road (Route 19) possible in either direction between mile markers 14 and 16, vicinity of Kolekole Beach Park and Umauma Stream, on Monday, Feb. 6, through Thursday, Feb. 9, from 8:30 a.m. to 4:30 p.m., for vegetation cutting
LAUPAHOEHOE
Single lane closure on Hawaii Belt Road (Route 19) possible in either direction between mile markers 23 and 28, Kapehu Road to vicinity of Stevens Road, on Monday, Feb. 6, through Friday, Feb. 10, from 8:30 a.m. to 3 p.m. for paving.
KEAAU-PAHOA ROAD (ROUTE 130)
KEAAU
Single lane closure on Keaau-Pahoa Road (Route 130) possible in either direction between mile markers 0 and 3, Volcano Road and the Adopt A Highway sign, on Monday, Feb. 6, through Friday, Feb. 10, from 8:30 a.m. to 4:30 p.m. for vegetation cutting.
KEAAU TO HAWAIIAN PARADISE PARK
Single lane closure on Keaau-Pahoa Road (Route 130) possible in either direction between mile markers 3 and 5, vicinity of the Adopt A Highway sign and between Puakalo Street and Kaloli Drive, on Monday, Feb. 6, through Friday, Feb. 10, from 8:30 a.m. to 4:30 p.m. for vegetation removal from culverts.
KOHALA MOUNTAIN ROAD (ROUTE 250)
KOHALA
Single lane closure on Kohala Mountain Road (Route 250) possible in either direction between mile markers 5 and 9, vicinity of the Koaiʻa Tree to past the Kohala Ranch Road, on Monday, Feb. 6, through Friday, Feb. 10, from 8:30 a.m. to 4:30 p.m. for shoulder stabilization.